Bath Crashers S08E05 - Sky-High Ceiling

Bath Crashers

Sinopse

Before: Eight Sides of Horror. After: A showstopper. This octagon-shaped space has 12-foot ceilings, a wall of windows and tons of potential. To give this bath the modern look the homeowner wants, everything must get ripped out. The new layout is made square and filled with a big, beautiful shower with body sprays and speakers. On the floor, which is heated, half the room is covered with a fumed oak and underneath the soaking tub lays black pebbles. Behind the tub, the old windows get replaced by an entire wall of sliding glass panels, which gives the perfect view to the outdoors.

Informações

  • Status: Transmitido
  •  
  • Data de Exibição: 09/09/2013
  •  
  • Duração do Episódio: 30 minutos
  •  
  • Emissora: US DIY Network

Você já viu?

Assistido:
Nota:

Sobre o Episódio

Este episódio de Bath Crashers ainda não tem nenhuma legenda disponível.